IT / Low Voltage (Structured Cabling)
Low-voltage and structured cabling takeoffs in minutes
Drop in the telecom drawings or the full bid set. BidTakeoff sorts the T-sheets, counts data outlets, WAPs and faceplates by room, and pulls MDF/IDF, backbone and rack equipment from the spec and risers.
50 free credits. An estimating aid — always verify before you bid.
Example IT / Low Voltage takeoff
A fictional project showing the results screen and Excel export.
Three-story medical office core and shell with tenant fit-out on Level 2. Category 6A horizontal cabling to every outlet, ceiling WAPs on a grid, and fiber backbone from the MDF on Level 1 to an IDF on each floor.
| Exam Room | 2 |
| Workstation Area | 1 |
| Lobby/Reception | 1 |
| Private Office | 1 |
| IDF/MDF | 1 |
- 202 Exam 2: Spec says 3 outlets per exam room; plan shows 2 — confirm.
- Q1Confirm whether WAP hardware is owner-furnished (cabling only assumed).
- Q2Spec calls for Cat 6A; legend note references Cat 6 — confirm.
| Data Outlets/Drops | 2-port data outlet, Cat 6A | 2 | T-202 |
Quantities are editable before you export.
What you get
- ✓Data drop and WAP counts per room and per floor
- ✓IDF/MDF rack, patch panel and backbone items
- ✓Works from Division 27 specs, telecom plans, or both
- ✓Sheet index showing exactly which sheets were read
Categories counted
Data Outlets/Drops, Wireless Access Points, Faceplates & Jacks, Horizontal Cable, Backbone Fiber/Copper, Racks & Cabinets, Patch Panels, Cable Management, Pathways/Ladder Rack, Grounding & Bonding, Network Electronics, Other.
Spec sections we read
Division 27 05 xx, 27 10 00, 27 11 xx (equipment rooms/IDF/MDF), 27 13 xx (backbone), 27 15 xx (horizontal cabling), 27 21 xx (data network), wireless access points, outlet/faceplate schedules.
Frequently asked questions
What files can I upload?+
PDF specifications (project manual or individual trade sections) and PDF drawing sets — including full 100% CD sets with every discipline. BidTakeoff finds your trade's sheets automatically. Files up to 1 GB.
Can I quote from drawings only, without a spec?+
Yes. Many bids only include a CD set. BidTakeoff reads the legend and schedules, counts devices on each trade plan by room, and uses the architectural plans for the room list when needed.
Which trades are supported?+
Audiovisual, IT/low-voltage structured cabling, security (access control, video surveillance, intrusion), fire alarm, DAS/ERRCS, and general low voltage. You can scan for several trades in one job.
Does it write RFIs?+
Yes. Every takeoff includes draft RFI questions for conflicts and gaps it finds — spec vs. drawing mismatches, rooms with no devices, missing legends or schedules, and by-others items — with sheet and section references. They're in the results and on the RFIs & Assumptions tab of the Excel export. Review and edit before sending.
How accurate is it?+
It is an AI estimating aid, not a final count. It is designed to get you most of the way in minutes and flag open questions, but every quantity should be verified against the contract documents before you price your bid.
How much does it cost?+
Credits are charged per page: 1 per spec page and 2 per drawing sheet, with each additional trade adding 50%. Monthly plans start at $99 for 1,000 credits; one-time packs are also available. You see the exact cost before anything runs, and failed jobs are refunded.
What happens to my bid documents?+
Uploaded files are deleted automatically as soon as your takeoff finishes. Documents are processed by our AI provider under terms that prohibit training on your data. You can delete your account and results at any time.